This project will reduce the sewage odor and protect the integrity of the pipes. Crews are installing an enclosed concrete structure that will contain carbon material that will absorb the gas via two foul air ducts connected to a MID interceptor. It will remove the odor before discharging cleaner air. The project is expected to be completed by March 2024. It was funded with the American Rescue Plan Act funds and cost a total of $12 million.